Home Contact Us Sign In
Welcome Guest, Register Here
MenuMaker produced NavBar
     

 

                                                                  

 
     
 
     

A Technical Staff Evaluation is given at the start of training and at the end of training. The tests are used to understand the level of knowledge your workforce has about injection molding.

 
     
   
 
  • The information gathered by the instructor from the pre-tests is necessary to achieving key insight into the knowledge level of your injection molding workforce. The instructor will then have a better understanding of where to direct the training efforts for the best results from the training session.

 

 
 
  • The information the instructor gets from a Pre-Test Technical Staff Evaluation also gives the instructor a good understanding on how fast he/she may cover particular material for a given class.

 

 
 
  • There is a final Post-Test Technical Staff Evaluation at the end of training. This is used in a direct comparison with the Pre-Test Results to see how much a particular workforce has gained and retained from the training session.

 

 
 
  • This final comparison between the pre-test and the post-test also lets us know what future training may be necessary.

 

 
 

 

 
         
 

 

 

     
ZIPPS LLC 1207 E. Main Street Luray VA  22835 Phone 1.540.743.1115 Fax 1.540.743.1388
  ZIPPS understanding your problems, and helping you solve them!

Sitemap